6IB600STD

600 Interbloc Standard Block

This is a standard 600mm x 600mm x 600mm Interbloc block is used as an alternative to a 1800 block for finishing the ends of walls flush. The block weighs 500kgs and has a certified central lifting anchor. The lifting points can also be used as an anchoring point for ropes and strops. 

Please note you will need 2 x 2.5t Lifting Klaws for this product (sold separately).

What Can I Use This Block For?

  • Counterweights and Bollards
  • Alternative to 1800 Blocks for Ends of Walls
  • Barriers
Why Interbloc?
  • Super fast install time
  • Stackable blocks for strong structures
  • Safe, certified lifting points
  • 15 years experience
  • Comprehensive warranties

Build Faster, Stronger, Safer with Interbloc.

Customer Reviews

Based on 2 reviews Write a review

Dimensions:600x600x600mm Weight:500kg SKU:6IB600ESTDPG

You've been given an automated freight price. We may be able to find a lower freight price for you by talking to our suppliers about backloads. Interested? Click the button below and we'll see what we can do.

The current lead time for producing the Interbloc range is 8 weeks. 

Fulton Hogan Silverdale

When additional aggregate storage was required at Fulton Hogan’s asphalt manufacturing plant in Silverdale, the company specified Interbloc. It was a no-brainer - Fulton Hogan has extensive experience utilising the Interbloc system throughout the country for similar purposes.

Settlement Pond for the Waterview Tunnel

Interbloc was contracted to supply blocks for the project and build a two-bay settling pond owing to a few key factors.

Liveable Streets

Liveable Streets is a joint venture between HEB Construction and Higgins Contracting. Its primary goal is to deliver the Central East Road Corridor Maintenance Contract for Auckland Transport.

Wyatt's Landscape Supplies

Wyatt Landscape Supplies is the latest addition to the Wyatts Haulage group based in Warkworth, north of Auckland. Key to setting up and running a landscape supplies yard is a well organised site for you and your clients to navigate easily, and the flexibility to rearrange bins as demand for materials change.

Fulton Hogan Quarry Hopper

One of Fulton Hogan’s customers in Christchurch required a 6m high hopper pit for a quarry, where aggregates will be dumped and processed. The hopper is loaded from the top by truck and trailer which is then fed into a conveyor system that went through a screening plant. The project also required a ramp up to and down off the hopper for a truck and trailer which also needed to be loaded manually from one side.

Visy- OI

Since 1922, O-I New Zealand (O-I NZ) has supported the local food and beverage industries – particularly New Zealand’s renowned wine industry.  Today, the facility employs around 250 people and consists of three furnaces and six production lines which produce almost 200,000 packed tonnes of glass products or around 665 million containers each year.

Auckland Transport
Ballance Agri-Nutrients
Claymark
Daltons Landscape Supplies
Downer
EnviroWaste
Fulton Hogan
Ghella Abergeldie
JFC Ltd
McConnell Dowell
Naylor Love
OJI Fibre Solutions
Ravensdown
Rock and Rubble
Rocket Lab
Simcox Construction
Sims Metal Management
Waste Management