Ram raids have increased over the past few months across New Zealand. Many retailers, small business owners, and security companies are looking into loss prevention tactics to counteract the effects of ramraids. To help the community combat this, we introduced BollardBloc - a block that’s both a bollard and outdoor furniture.

BollardBloc

(BollardBloc)

 

Ram raids can have a dire effect on businesses, communities, and people alike. Nathan, the Loss Prevention Manager from The Briscoes Group states:

Ram raids aren’t just about the loss of stock, it’s also about damage to the building and morale which takes a big dive in these sorts of situations, the cleanup costs, then its months and months of repair work and waiting for the product to repair what has been damaged”

To avoid these impacts from ram raids, The Briscoe Group reached out to us to install BollardBloc in a selection of their Rebel Sports and Briscoes stores. Prior to using our system, they used bollards that were embedded deep into the ground. Because of the services that ran underneath the paths, The Briscoes Group needed a solution that could sit on top.

 


( On the left, Nathan is placing BollardBloc next to their existing bollards)

Installation for BollardBloc is simple. Unlike traditional bollard systems, you just need to place BollardBloc where you need it. You don’t need to pull up any concrete or disrupt services to protect your property. In most cases, you also don’t need council approval to place BollardBloc.

The Briscoes Group chose to go with BollardBloc for a number of reasons. The main reasons being:

To understand the positive impact of having BollardBloc as ramraid protection, watch the video below with Nathan from The Briscoes Group.

Wanting a simple solution to tackle ramraids? Buy BollardBloc

Envirocon products fit perfectly with the sustainability aims of the City Rail Link (CRL) project in Auckland. Our Interbloc blocks are the adaptable, versatile answer to stalling carbon emissions across multiple sites on this major project.

The Link Alliance is delivering the $4.4 billion, underground City Rail Link (CRL), which is the largest transport infrastructure project ever undertaken in New Zealand. 3.45km of underground tunnels are being formed up to 42 metres below the Auckland city centre, which when completed will allow the rail network to at least double its capacity by linking Mt Eden Station with Britomart in Auckland’s CBD. Britomart will then become a through station, with two brand new stations also being constructed near Aotea Square and Karangahape Road. The whole project is scheduled to be completed by late 2024.

Envirocon’s Interblocs are made from top quality wet concrete that had been excess to requirements for a number of other jobs, and Envirocon saves this from landfill by creating Interblocs. They become a system of certified, precast, solid concrete blocks that are cost effective, can be erected quickly, have excellent horizontal shear strength in both directions, and can be reconfigured on site as required.

Envirocon and the Link Alliance started working together as soon as construction commenced in 2019. The Link Alliance purchased Interblocs from Envirocon, and also realised this was a way to use their own surplus concrete. As a result, Envirocon’s Interbloc waste concrete block system is now used across multiple Link Alliance sites.

Nick Braxton is the Principal Sustainability Advisor for the Link Alliance. He explains that the Alliance has a “zero waste to landfill” policy that makes Envirocon a perfect partner for them. “Our non- linear approach to waste management means we’re using excess concrete for a wide range of purposes instead of sending it to landfill,” he says.

“Interbloc blocks are excellent choices for this project, because they are so versatile and are made from waste concrete,” agrees Section Engineer Eva Brasius. Consequently, they support the achievement of Link Alliance’s sustainability goals around waste diversion from landfill, and help to reduce the project’s carbon footprint."

We find the Interbloc system easy, efficient, and simple to assemble,” comments Project Engineer Emmanuel Chatoux. “The blocks are used for a range of purposes including hoarding supports, the construction of muck bins, work zone delineation, and temporary retaining walls. The construction industry overall is a big carbon emitter and by using the Interbloc system, we’re making sure our project is as carbon neutral as possible.”

Once the CRL project is complete the blocks will be returned to Envirocon, used on other projects being undertaken by the Link Alliance’s construction partners, or sold on.

Interblocs’ versatility is ideal for big projects like the CRL one, because the blocks can be used across a number of sites for a range of purposes. They work well as permanent structures too, both large and small.

Check the system out today, or have a chat with our friendly staff.

Situation

Southbase Construction is an ambitious company with a clear vision: to have the best delivery track record in the industry, bar none. Originally from Christchurch, the business now operates NZ wide.

Recently Southbase Construction chose Interbloc’s concrete weight hoarding solution for the Massey University Construction site. The very high wind zone of the site, and short timeframe of the project, demanded a fast and strong solution. Health and safety demands hoardings around construction sites.


Solution

Interbloc was able to offer around 200 one tonne concrete weights at short notice and organise delivery to site. For these reasons Kurtis Graham, Project Manager, was stoked with our Interbloc concrete weight solution.


Benefits

– H&S compliant, non-flowable weights. 
– Concrete weights ranging from 10-1500kg.
– Delivery at short notice.
– Full service, through the organising delivery on site.
– Blocks can be sold back/sold on at the end of the project.